ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certified.
              
  • Go to Home
  • +2349094001000
  • info@mainstream.com.ng
ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certified.
Logo
Slide background
Slide background

The available capacity of the
Kainji Hydro Power Plant is 520MW.

Slide background

The available capacity of the
Jebba Hydro Power Plant is 482MW.

Generating electricity in a most environmentally friendly manner.

Slide background

The available capacity of the
Zungeru Hydro Power Plant is 700MW.

Slide background

Ten Years of Powering
Homes and Businesses.

Slide background

The Total Available Capacity of the Three Plants is 1,702MW.
                         (Kainji - 520MW, Jebba - 482MW, Zungeru - 700MW)

Leave A Message

You are welcome. Do not leave without leaving a message


News Center

Nigeria-based Mainstream Energy Solutions Limited, through its Mainstream Academy, in collaboration with the North-East Development Commission (NEDC), has trained fifty people in an intensive Technical Development Programme...... Continue reading
11 March 2024

Mainstream Energy Solutions Limited and the Northeast Development Commission (NEDC) have insisted that a drastic improvement in manpower remains sacrosanct in Nigeria if the country meets the projected electricity supply target...... Continue reading
07 March 2024

Mainstream Energy Solutions Limited, in collaboration with the Northeast Development Commission (NEDC), has wrapped up a rigorous Technical Development Programme, empowering 50 individuals as proficient linesmen/technicians .... Continue reading
06 March 2024

Usman Umar, leads Mainstream Academy, a division of Mainstream Energy Solutions Limited, overseeing Jebba, Kainji and Zungeru dams, along with YEDC...... Continue reading
13 December 2023